BSCL

Belgaum Smart City Survey and Design

  • Post published:26th September 2020
  • Post author:synergy_admin
  • Post category:Design Consultancy

Survey for smart city was carried out under the banner QUPRO ENGINEERS AND MANAGERS PVT.LTD. The project included survey of the area given in the scope. Precisely from GLOBE talkies…

Continue ReadingBelgaum Smart City Survey and Design
Read more about the article 33kV Sub station Design at Shanti Foumach Pvt Ltd.

33kV Sub station Design at Shanti Foumach Pvt Ltd.

  • Post published:26th September 2020
  • Post author:synergy_admin
  • Post category:Design Consultancy

33kV substation extension was done in the month of December-2019. The project was to install a new transformer for the furnace. The project included complete design and consulting. The project…

Continue Reading33kV Sub station Design at Shanti Foumach Pvt Ltd.
Read more about the article Bus Duct Installation

Bus Duct Installation

  • Post published:26th September 2020
  • Post author:synergy_admin
  • Post category:Installation

5000A bus Duct installation was done at Ashok Iron Works Pvt Ltd. The length was 60 meters. The activity was carried out in the Month of June-2019. The contract was…

Continue ReadingBus Duct Installation
  • 1
  • 2
  • Go to the next page
  • Home
  • Contact
  • Log In

Privacy Policy

© Copyright - Synergy Electrical Consultants

Designed and developed by KatSquare
Close Menu